| WP |
Del. |
# |
Title |
version |
last known |
Autor |
Conf./
Public |
Delivery date
T0 + months |
| WP 0 |
D0-1 |
1 |
Project
Management Plan & Quality Plan |
1.3 |
09-02 2005 |
NLR |
C |
1 |
| WP 0 |
D0-2 |
2 |
Board meeting
minutes |
N/a |
N/a |
- |
C |
|
| WP
0 |
D0-3 |
3 |
Six-monthly
progress reports (see QRPR) |
- |
- |
- |
C |
6,12,18,24,30,36 |
| WP 0 |
D0-4 |
4 |
Cost-statements
(available via co-ordinator) |
- |
- |
- |
C |
18,36 |
| WP 0 |
D0-5 |
5 |
Project
Quality Plan |
1.3 |
09-02 2005 |
NLR |
C |
3 |
| WP 0 |
D0-6 |
6 |
Project exploitation plan |
- |
- |
NLR |
P |
40 |
| WP 0 |
D0-7 |
7 |
Intermediate
results publication (see QRPR) |
- |
- |
- |
P |
12,24 |
| WP 1 |
D1-1 |
8 |
Identification
document |
1.0 |
03-03 2003 |
SICTA |
P |
16 |
| WP 2 |
D2-1 |
9 |
Validation
methodology report, Appendices |
2.0 |
08-06 2005 |
Isdefe |
P |
17 |
| WP 3 |
D3-1.1 |
10 |
Generic
definition of new noise abatement procedures |
1.1 |
03-08 2005 |
INECO |
P |
16 |
| WP 3 |
D3-1.2 |
11 |
Detailed
definition of new noise abatement procedures |
3.0 |
06-09 2005 |
INECO |
P |
42 |
| WP 3 |
D3-2 |
12 |
Requirements
document for the pilot and controller tools |
1.1 |
12-08 2004 |
INECO |
P |
42 |
| WP 4 |
D4-1
|
13 |
Report
on the global results; compilation of D4.1-1, D4.2-1 and D4.3-1
|
2.0
|
04-09 2006
|
AENA
|
P
|
42
|
| WP 4 |
D4-1-1a
|
-
|
FTS
Capacity results summary
|
2.0
|
18-05 2006
|
AENA
|
P
|
44
|
| WP 4 |
D4-1-1b
|
-
|
FTS
Noise results summary
|
2.0
|
12-06 2005
|
AENA
|
P
|
44
|
| WP 4 |
D4-1-2a
|
-
|
Capacity
results Schiphol
|
1.3
|
14-12 2005
|
NLR
|
P
|
42
|
| WP 4 |
D4-1-2b
|
-
|
Noise
results Schiphol
|
1.0
|
26-01 2006
|
NLR
|
P
|
43
|
| WP 4 |
D4-1-3a
|
-
|
Capacity
results Barajas
|
2.0
|
26-01 2006
|
AENA
|
P
|
42
|
| WP 4 |
D4-1-3b
|
-
|
Noise
results Barajas
|
1.0
|
13-02 2006
|
AENA
|
P
|
43
|
| WP 4 |
D4-1-4a
|
-
|
Capacity
results Charles de Gaulle
|
2.0
|
03-07 2006
|
EEC
|
P
|
42
|
| WP 4 |
D4-1-4b
|
-
|
Noise
results Charles de Gaulle
|
1.0
|
18-05 2006
|
EEC
|
P
|
43
|
| WP 4 |
D4-1-5a
|
-
|
Capacity
results Capodichino
|
1.2
|
15-03 2006
|
SICTA
|
P
|
42
|
| WP 4 |
D4-1-5b
|
-
|
Noise
results Capodichino
|
1.0
|
06-03 2005
|
SICTA
|
P
|
43
|
|
WP 4
|
D4.2-1
|
-
|
Safety
assessment of Sourdine II (Top level document)
|
2.0
|
01-08 2005
|
NLR
|
P
|
43
|
| WP 4 |
D4.2-2a
|
-
|
Safety
assessment of Approach procedure II-A on Schiphol airport
(Main document)
|
2.0
|
01-08 2005
|
NLR
|
P
|
38
|
| WP 4 |
D4.2-2b
|
-
|
Safety
assessment of Approach procedure II-A on Schiphol airport
(Argumentation-based analysis)
|
2.0
|
01-08 2005
|
NLR
|
P
|
38
|
| WP 4 |
D4.2-2c
|
-
|
Safety
assessment of Approach procedure II-A on Schiphol airport
(Simulation-based analysis)
|
2.0
|
01-08 2005
|
NLR
|
P
|
38
|
| WP 4 |
D4.2-2d
|
-
|
Safety
assessment of Approach procedure II-A on Schiphol airport
(Collection of expert interviews)
|
2.0
|
01-08 2005
|
NLR
|
P
|
38
|
| WP 4 |
D4.2-3
|
-
|
Safety
assessment of Approach procedure V and Departure procedure
2 on Barajas airport
|
2.0
|
01-08 2005
|
AENA
|
P
|
42
|
| WP 4 |
D4.3-1
|
-
|
Cost
benefit analysis results
|
2.0
|
12-06 2006
|
SICTA
|
P
|
44
|
| WP 5 |
D5-1 |
15 |
Noise
and Emission Modelling requirements |
1.0 |
20-06 2002 |
EEC |
P |
7 |
| WP 5 |
D5-2 |
16 |
Noise
and Emission Modelling methodology |
1.0 |
11-04 2006 |
EEC |
P |
44 |
| WP 5 |
D5-3 |
17 |
Results
op optimisation and preliminary impact analysis |
0.1 |
23-01 2003 |
AIF |
P |
19 |
| WP 5 |
D5-4 |
18 |
Results
of noise and emission analysis |
1.0 |
03-07 2006 |
EEC |
P |
44 |
| WP 6 |
D6-1 |
19 |
Prototyping
results ATC simulator |
2.0 |
01-09 2005 |
NLR |
P |
36 |
| WP 6 |
D6-2 |
20 |
Prototyping
results flight simulator |
2.0 |
01-09 2005 |
NLR |
P |
36 |
| WP 6 |
D6-3 |
21 |
Real
Time simulation results |
2.0 |
05-10 2005 |
NLR |
P |
42 |
| WP 6 |
D6-4 |
- |
Experiment
design ATC simulations |
2.0 |
01-09 2005 |
NLR |
P |
35 |
| WP 6 |
D6-5 |
- |
Experiment
design flight simulations |
2.0 |
01-09 2005 |
NLR |
P |
35 |
| WP 6 |
D6-6 |
- |
Concept
of operations for Schiphol airport simulations |
2.0 |
01-09 2005 |
NLR |
P |
34 |
| WP 7 |
D7-1 |
22 |
Validation
process control, appendices |
1.0 |
19-12 2005 |
Isdefe |
P |
43 |
| WP
7 |
D7-2
|
23
|
Comparitive
Analysis
|
1.0
|
19-12 2005
|
Isdefe
|
P
|
44
|
| WP 8 |
D8-1 |
24 |
Implementation
plan |
2.0 |
20-12 2005 |
INECO |
P |
44 |
| WP 9 |
D9-1 |
25 |
Final
document |
1.1 |
31-8 2006 |
NLR |
P |
45 |
| WP 10 |
D10-1 |
26 |
Expert Panel Documents
|
- |
- |
NLR |
P |
- |
| |
D10-1-1a |
|
Sourdine
II, May 2002 Expert Panel brainstorm results. |
1.0 |
|
|
|
|
| |
D10-1-1b |
|
Sourdine
II, May 2002 Expert Panel questionnaire results |
1.0 |
|
|
|
|
| |
D10-1-2 |
|
Sourdine
II, September 2002 workshop results |
1.0 |
|
|
|
|