Documents

General Sourdine II documents

Work pkg. Title version last known
WP 0 Annex 1:Description of Work 1.0 18 October 2002
WP 0 Part A Final 26 September 2000
WP 0 Part B Final 29 September 2000
WP 0 Part C Final 29 September 2000
WP 0 Project planning Final 24 June 2004
WP 0 Consortium Agreement Final March 2003
WP 0 Updated Description of Work Final 13 July 2004

Overall project deliverables

WP Del. # Title version last known Autor Conf./
Public
Delivery date
T0 + months
WP 0 D0-1 1 Project Management Plan & Quality Plan 1.3 09-02 2005 NLR C 1
WP 0 D0-2 2 Board meeting minutes N/a N/a - C
WP 0 D0-3 3 Six-monthly progress reports (see QRPR) - - - C 6,12,18,24,30,36
WP 0 D0-4 4 Cost-statements (available via co-ordinator) - - - C 18,36
WP 0  D0-5 5 Project Quality Plan 1.3 09-02 2005 NLR C 3
WP 0 D0-6 6 Project exploitation plan - - NLR  P 40
WP 0 D0-7 7 Intermediate results publication (see QRPR) - - - P 12,24
WP 1 D1-1 8 Identification document 1.0 03-03 2003 SICTA P 16
WP 2 D2-1 9 Validation methodology report, Appendices 2.0 08-06 2005 Isdefe P 17
WP 3 D3-1.1 10 Generic definition of new noise abatement procedures 1.1 03-08 2005 INECO P 16
WP 3 D3-1.2 11 Detailed definition of new noise abatement procedures 3.0 06-09 2005 INECO P 42
WP 3  D3-2 12 Requirements document for the pilot and controller tools 1.1 12-08 2004 INECO P 42
WP 4

D4-1

13

Report on the global results; compilation of D4.1-1, D4.2-1 and D4.3-1

2.0

04-09 2006

AENA

P

42

WP 4

D4-1-1a

-

FTS Capacity results summary

2.0

18-05 2006

AENA

P

44

WP 4

D4-1-1b

-

FTS Noise results summary

2.0

12-06 2005

AENA

P

44

WP 4

D4-1-2a

-

Capacity results Schiphol

1.3

14-12 2005

NLR

P

42

WP 4

D4-1-2b

-

Noise results Schiphol

1.0

26-01 2006

NLR

P

43

WP 4

D4-1-3a

-

Capacity results Barajas

2.0

26-01 2006

AENA

P

42

WP 4

D4-1-3b

-

Noise results Barajas

1.0

13-02 2006

AENA

P

43

WP 4

D4-1-4a

-

Capacity results Charles de Gaulle

2.0

03-07 2006

EEC

P

42

WP 4

D4-1-4b

-

Noise results Charles de Gaulle

1.0

18-05 2006

EEC

P

43

WP 4

D4-1-5a

-

Capacity results Capodichino

1.2

15-03 2006

SICTA

P

42

WP 4

D4-1-5b

-

Noise results Capodichino

1.0

06-03 2005

SICTA

P

43

WP 4

D4.2-1

-

Safety assessment of Sourdine II (Top level document)

2.0

01-08 2005

NLR

P

43

WP 4

D4.2-2a

-

Safety assessment of Approach procedure II-A on Schiphol airport (Main document)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-2b

-

Safety assessment of Approach procedure II-A on Schiphol airport (Argumentation-based analysis)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-2c

-

Safety assessment of Approach procedure II-A on Schiphol airport (Simulation-based analysis)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-2d

-

Safety assessment of Approach procedure II-A on Schiphol airport (Collection of expert interviews)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-3

-

Safety assessment of Approach procedure V and Departure procedure 2 on Barajas airport

2.0

01-08 2005

AENA

P

42

WP 4

D4.3-1

-

Cost benefit analysis results

2.0

12-06 2006

SICTA

P

44

WP 5 D5-1 15 Noise and Emission Modelling requirements 1.0 20-06 2002 EEC P 7
WP 5 D5-2 16 Noise and Emission Modelling methodology 1.0 11-04 2006 EEC P 44
WP 5  D5-3 17 Results op optimisation and preliminary impact analysis 0.1 23-01 2003 AIF P 19
WP 5 D5-4 18 Results of noise and emission analysis 1.0 03-07 2006 EEC P 44
WP 6 D6-1 19 Prototyping results ATC simulator 2.0 01-09 2005 NLR P 36
WP 6 D6-2 20 Prototyping results flight simulator 2.0 01-09 2005 NLR P 36
WP 6 D6-3 21 Real Time simulation results 2.0 05-10 2005 NLR P 42
WP 6 D6-4 - Experiment design ATC simulations 2.0 01-09 2005 NLR P 35
WP 6 D6-5 - Experiment design flight simulations 2.0 01-09 2005 NLR P 35
WP 6 D6-6 - Concept of operations for Schiphol airport simulations 2.0 01-09 2005 NLR P 34
WP 7 D7-1 22 Validation process control, appendices 1.0 19-12 2005 Isdefe P 43
WP 7

D7-2

23

Comparitive Analysis

1.0

19-12 2005

Isdefe

P

44

WP 8 D8-1 24 Implementation plan 2.0 20-12 2005 INECO P 44
WP 9 D9-1 25 Final document 1.1 31-8 2006 NLR P 45
WP 10 D10-1 26

Expert Panel Documents

- - NLR P -
  D10-1-1a   Sourdine II, May 2002 Expert Panel brainstorm results. 1.0        
  D10-1-1b   Sourdine II, May 2002 Expert Panel questionnaire results 1.0        
  D10-1-2   Sourdine II, September 2002 workshop results 1.0        

Sourdine II templates

Work pkg. Title version last known
- SII Document template V0.3 16 Oct 2002
- SII Meeting Minutes template V0.2 16 Oct 2002
- SII Presentation template V0.4 16 Oct 2002
- Quarterly Report Partner (QRPA) template V0.2 02 Sep 2002
- Quarterly Report Work Package (QRWP) template V0.1 16 Oct 2002
- Work Package plan template V0.1 02 Sep 2002

Work Package plans

Work pkg. Title Version
WP 1 Work Package plan WP 1 V0.1
WP 2 Work Package plan WP 2 V0.3
WP 3 Work Package plan WP 3 V0.1
WP 4 Work Package plan WP 4 V0.2
WP 5 Work Package plan WP 5 V0.2
WP 6 Work Package plan WP 6 V0.3
WP 7 Work Package plan WP 7 V0.2

Reporting

Period Q1-Q6 Q1-12 Final Pregress Report
Project        
SII   Mid term report Progress Report