WP 1 D1-1 8 Identification document 1.0 03/03/2003 SICTA P 6
WP 2 D2-1 9 Validation methodology report, Appendices 2.0 08-06 2005 Isdefe P 17
WP 3 D3-1.1 10 Generic definition of new noise abatement procedures 1.1 03-08 2005 INECO P 16
WP 3 D3-1.2 11 Detailed definition of new noise abatement procedures 3.0 06-09 2005 INECO P 42
WP 3  D3-2 12 Requirements document for the pilot and controller tools 1.1 12-08 2004 INECO P 42
WP 4

D4-1

13

Report on the global results; compilation of D4.1-1, D4.2-1 and D4.3-1

2.0

04-09 2006

AENA

P

42

WP 4

D4-1-1a

-

FTS Capacity results summary

2.0

18-05 2006

AENA

P

44

WP 4

D4-1-1b

-

FTS Noise results summary

2.0

12-06 2005

AENA

P

44

WP 4

D4-1-2a

-

Capacity results Schiphol

1.3

14-12 2005

NLR

P

42

WP 4

D4-1-2b

-

Noise results Schiphol

1.0

26-01 2006

NLR

P

43

WP 4

D4-1-3a

-

Capacity results Barajas

2.0

26-01 2006

AENA

P

42

WP 4

D4-1-3b

-

Noise results Barajas

1.0

13-02 2006

AENA

P

43

WP 4

D4-1-4a

-

Capacity results Charles de Gaulle

2.0

03-07 2006

EEC

P

42

WP 4

D4-1-4b

-

Noise results Charles de Gaulle

1.0

18-05 2006

EEC

P

43

WP 4

D4-1-5a

-

Capacity results Capodichino

1.2

15-03 2006

SICTA

P

42

WP 4

D4-1-5b

-

Noise results Capodichino

1.0

06-03 2005

SICTA

P

43

WP 4

D4.2-1

-

Safety assessment of Sourdine II (Top level document)

2.0

01-08 2005

NLR

P

43

WP 4

D4.2-2a

-

Safety assessment of Approach procedure II-A on Schiphol airport (Main document)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-2b

-

Safety assessment of Approach procedure II-A on Schiphol airport (Argumentation-based analysis)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-2c

-

Safety assessment of Approach procedure II-A on Schiphol airport (Simulation-based analysis)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-2d

-

Safety assessment of Approach procedure II-A on Schiphol airport (Collection of expert interviews)

2.0

01-08 2005

NLR

P

38

WP 4

D4.2-3

-

Safety assessment of Approach procedure V and Departure procedure 2 on Barajas airport

2.0

01-08 2005

AENA

P

42

WP 4

D4.3-1

-

Cost benefit analysis results

2.0

12-06 2006

SICTA

P

44

WP 5 D5-1 15 Noise and Emission Modelling requirements 1.0 26/06/2002 EEC P 3
WP 5 D5-2 16 Noise and Emission Modelling methodology 1.0 11-04 2006 EEC P 44
WP 5 D5-3 17 Single event noise calculations 1.0 23/06/2003 AIF P 12
WP 5 D5-4 18 Results of noise and emission analysis 2.0 03-07 2006 EEC P 44
WP 6 D6-1 19 Prototyping results ATC simulator 2.0 01-09 2005 NLR P 36
WP 6 D6-2 20 Prototyping results flight simulator 2.0 01-09 2005 NLR P 36
WP 6 D6-3 21 Real Time simulation results 2.1 05-10 2005 NLR P 42
WP 6 D6-4 - Experiment design ATC simulations 2.0 01-09 2005 NLR P 35
WP 6 D6-5 - Experiment design flight simulations 2.0 01-09 2005 NLR P 35
WP 6 D6-6 - Concept of operations for Schiphol airport simulations 2.0 01-09 2005 NLR P 34
WP 7 D7-1 22 Validation process control, appendices 1.0 19-12 2005 Isdefe P 43
WP 7

D7-2

23

Comparitive Analysis

1.0

19-12 2005

Isdefe

P

44

WP 8 D8-1 24 Implementation plan 2.0 20-12 2005 INECO P 44
WP 9 D9-1 25 Final document 1.1 31-8 2006 NLR P 45
      Executive summary